Infrastructure Minutes

May 20, 1998

The group met and responded to the following questions: Why would we choose to build at this site (Wilson School); Should we add on to a K-3 structure to house Pre-K?

 

The possibilities being investigated were as follows.

  • (1)New building at Wilson to support grades 4-6 and move all pre-school to a remodeled Wilson
  • (2)Remodel Wilson as a 4-6 building and add on to all or some of the K-3 buildings
  • (3)Eliminate Dirksen and redraw boundaries and do either of the above options (1 or 2)
  • (4)Build a new building at an existing campus (+ indicates available space, - indicates lack of available space): BJHS (+), Edison (-), Sunset (+), Willow (-), Starke (-), Wilson (+), Jefferson (-)
  • (5)Build at a new location, i.e. Park District, City land, High School land (buy or trade land)
  • (6)West Campus
  • (7)Build a new Broadmoor Junior High School at Wilson facility and move the intermediate school to BJHS
  • (8)Build a new pre-K structure and remodel Wilson for 4-6

 

The following could be used to evaluate each of the proposals. A + and – could be used to determine appropriateness. A + if the factor is favorable and a – if it is not favorable.

 

Factors

#1

#2

#3

#4

#5

#6

#7

#8

Access to building

               

Residential Congestion

               

Population of neighborhood

               

New Subdivision

               

Size of lot to build on

               

Location in relationship to other schools

               

Relationship to population of the district

               

Additional staff needed (administration and secretary)

               

Site acquisition required

               

Asbestos Removal

               

Cost to remodel

               

Boundary change required

               

Affects on choice program

               

Transportation

               

Cost

               

Handicapped accessible

               

 

Tasks to be completed by the next meeting date: June 3 at Wilson School

 

Consider the following:

  1. Are there any more options to consider other than the 8?
  2. Is there anything that needs to be added to the matrix?
  3. Does the format of the matrix need to be altered?
  4. What information do we need to have in order to do our work?

 

The following information has already been identified along with the individual responsible for gathering the needed information.

  1. Land plats for school sites –
  2. District Demographics –
  3. Needed Pre-K space/rooms – Chuck Bowen


Pekin Public Schools District 108
501 Washington Street
Pekin, IL 61554
Phone: 309.477.4740
Fax: 309.477.4701

This page was last updated on Wednesday, July 21, 2004
© 1996-2004 Pekin Public Schools District 108. All Rights Reserved.
Legal Disclamer | Feedback Form | Sitemap | Interactive Map | Help