|
Schoolwide Title I Plan for 04-05
A.J. discussed that we will have schoolwide Title I status next
year. There are numerous requirements in order to have this status,
and Cindy has helped our SIP team develop a plan that will meet
these requirements. A.J. passed out documents outlining the procedure.
These included flowcharts for the overall plan, and formative flowcharts
for each grade level (2nd and 3rd are combined).
The C. B. Smith ARC (At Risk Committee) flowchart also was looked
at and discussed. This program was developed by Wilson over the
last four years, and all schools will implement it next year. A.
J. explained the differences between ARC and STAT and said that
STAT will still exist, but only after a child has gone through ARC.
In addition to the flowchart, SILT members looked at the At-Risk
Committee Rubric that will be used next year. A. J. will be introducing
the Schoolwide Plan and ARC to the staff next week.
|