WASHINGTON INTERMEDIATE SCHOOL

SILT MEETINGS

WEDNESDAY JANUARY 5, 2000

2:50 – 4:30 PM

VISUAL ARTS ROOM


 
TOPIC
BY WHOM
OUTCOME
TIME
WELCOME/WARM-UP
NANCY/JAN
FOOD, FUN & FELLOWSHIP
2:50-3:00
FEEDFORWARD
DAVE
IDENTIFY ISSUE(S)
3:00-3:05
FACILITY ENHANCEMENT
TEAM
  • WASHINGTON 2000 UPDATE
  • FACILITY NEEDS REPORT
  • ARAMARK ASSESSMENT REPORT
3:05 –3:20
FY ‘2000 BUDGET & EXPENDITURES
BRAD/MARY
UPDATE
3:20–3:35
EXTENDED DAY
NANCY
UPDATE
3:35 –3:45
ACTION TEAMS 1999
SILT CABINET
IDENTIFY TEAM MEMBERS
  • SIP & STAFF DEVELOPMENT 00-01
  • SPRINGFEST 2000
  • RETREAT 2000
  • SILT ASSESSMENT 2000
  • HOLIDAY OPEN HOUSE 2000
  • PTF 2000-01
  • BUDGET FY 2001 & UNUSED INSTRUCTIONAL DOLLARS 00-01
3:45 –3:55
JANUARY 14
TEAM
INSTITUTE UPDATE
3:55-4:05
ALERT 
BRAD
UNDERSTANDING
4:05 –4:10
COPY MACHINE
DAVE/BRAD
UPDATE
4:10-4:20
FEEDFORWARD 

REPRISAL

DAVE
  • PROVIDE ANSWERS
  • FUTURE SILT TOPIC
  • SET ACTION TEAM
4:20-4:30
Washington Intermediate School

SILT Meeting

Wednesday, January 5, 2000

Visual Arts Room

Members present: Jan Darnell, Diane Kennedy, Coach Mott, Brenda Wieburg, Connie Cox, Jackie Gray, Dawn Ackerman, Brad Hutchison, Jeff Liker, Nancy Waxler, Vickie Jones, Camille McCarty, Jan Taylor, Mary Lange

Feedforward: Coach

Facility Enhancement: Team FY 2000 Budget and Expenditures: Mary and Brad Extended Day: Nancy Action Teams 1999: SILT Cabinet

Brad reviewed who was already on action teams. There are spots open. Please let Brad and Nancy know ASAP if you would like to be apart of any teams.

January 14: Team Alert: Brad Copy machine: Dave/Brad

FACILITY and CAPITAL ITEMS THAT NEED TO BE

MAINTAINED, REPAIRED or REPLACED

TO SUPPORT THE CURRENT PROGRAM

Washington School 1999-2000


 
     
OPTIONAL
FOR OFFICE USE ONLY
Item
Prior
Rationale
Measure
Source of Funds
Schedule / Status
Security

FY 2000

  • Retrofit 1961 security system to match new 1929 security system
     
Replace Windows 2

FY 2000

  • Replace 1961 addition windows to match new 1929 windows
     
Install AC in WigWam and Learning Center 3

FY 2000

  • Poor air circulation in both areas creates an atmosphere that is not conducive to student learning.
  • Instruction time will be enhanced by improved comfort level of the students and staff
  • Both areas are used by students on a daily basis
  • Both areas accommodate a large number of students and teachers
  • Both areas are widely used by the district and community 
     
Replace heating system 4

FY 2000

  • Replace 1961 heating system to match new 1929 heating system
     
Replace sidewalks/ Bus loading area along Buena Vista 

Replace sidewalks and add bus loading area along 6th street 

5

FY 2000

  • Sidewalks are in need of repair. They are crumbling in some places. 
  • Children need to be able to get to and into the school through a safe walkway
  • Bus loading area is needed to allow students to load and unload the buses in a safe manner
     
Replace PA -Clock system 6

FY 2000

  • Replace PA and clock system in both the 1961 and 1929 Additions 
     
Replace handicap chairlift 7

FY 2000

  • Replace chairlift with new more reliable system
     
Relocate dumpster 8

FY 2000

  • Relocate dumpster to a new location away from main door used for recesss and public - especially after the new elevator is installed
     
Replace protective mats at each end of the wooden gym

(May be part of Washington 2000 Project)

9

FY 2000

  • Current mats are dated and unsafe
  • Safety and liability issues for gym classes and rentals
     
Add drinking fountain to wooden gym 10

FY 2000

  • Location of drinking fountain in the wooden gym would allow gym class to be interrupted less and supervision could occur
     
Remodel Restrooms 1

FY 2001

  • 1961 Addition restrooms need to be remodeled to match new 1929 addition restrooms
     
Refirbush doors, lockers, and ceilings in the 1961 addition to match 1929 building.

FY 2001 

  • Currently many doors and lockers are not in working order. 
  • New Ceiling in Learning Center 
Take out extra sinks in science rooms in the 1961 addition. Leave one working sink. Replace countertops in 1961 addition 

FY 2001

  • Exta sinks are not needed
  • Countertop space is needed 
  • Old countertops are in bad shape and have a sink stuck in the middle of them 
     
Replace all classroom door lock-systems - Please insure that the 1929 & 1961 additions match  4

FY 2001 

  • Our building is being used by the public on a regular basis during non-school hours.
  • Our building is being used for district activities with the public involved during non-school hours 
     
Paint rooms in the 1961 addition to match 1929 building. 5

FY 2001

  • Painting has not occurred for a long period of time and the historical renovation will help the building atmosphere.
     
Replace all classroom door lock-systems - Please insure that the 1929 & 1961 additions match  6

FY 2001 

  • Our building is being used by the public on a regular basis during non-school hours.
  • Our building is being used for district activities with the public involved during non-school hours 
     
Add new ventilation system to kitchen 7

FY 2001

  • Improve working conditions 
  • Remove unwanted heat and odors from student lunchroom 
Install new non-glare lighting in the Learning Center FY 2001
  • Increase comfort level for students, staff, and community members what work with computers in the LC

 
 

FACILITY and CAPITAL ITEMS THAT NEED TO BE

CREATED, ALTERED, or ENHANCED

TO SUPPORT FUTURE DISTRICT/SCHOOL IMPROVEMENT

WASHINGTON SCHOOL 1999-2000

 
     
OPTIONAL
FOR OFFICE USE ONLY
Item
Prior
Rationale
Measure
Source of Funds
Schedule/Status
Carpet all classrooms and Learning Center 1 FY 2001
  • Fulfills Building/District Strategic Plan
  • Improves quality of classroom and LC instruction by reducing noise level
  • Improves aesthetic quality of building
     
Remove drop down tables in main gym. Fix where tables have been removed 2 FY 2001

When main gym returns to its orginal state

  • The areas that have been boarded-up are weak and unsafe
  • Need to replace drop down tables with permanent wall fill-in 
     
Investigate a ventilation system for the wooden gym 3 FY 2001
  • Currently heat gets trapped in the ceiling area and has no where to flow so gym heats up during the day
  • Air does not circulate well during any of the seasons
     
Create and enhance office and storage equipment for gym 1 FY 2002
  • Computer drop and desk are needed
  • Possibility to look at re-vamping attic above office
     
Investigate removal of wall in Suzuki practice room 2 FY 2002
  • Possibility of removing wall for classroom expansion
     
Investigate repairing driveway and alleyway 3 FY 2002
  • Alley is in need of repair.
  • Driveway is cracking and crumbling. 
     
Install additional lighting in the storage room located directly below the Learning Center 4 FY2002
  • Increase safety
     
Redesign and improve library counter 5 FY 2002
  • Install newly designed counter with built in shelfs
     
Investigate adding a computer wall with technology and electrical outlets incorporated

(Similar to temporary wall located in the main gym)

6 FY 2002
  • It would create an optimal learning environment within the LC which is safe and up-to-date